Installation Overview Newsome has efficiently finalised the installation and commissioning of a new 400 kW chiller at a leading confectionery manufacturing site in York. This initiative supports a substantial step forward in the client’s Environmental, Social and Governance framework, enhancing process stability and achieving measurable reductions in both energy consumption https://livebackpage.com/story6189722/high-efficiency-400-kw-chiller-installation-achieves-50k-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving